Your real exam C4070-622 practice material will download as a single PDF or complete testing engine as well as other technical exam PDF and exam engine downloads. Forget buying your prep materials separately at three time the price of our unlimited access plan skip the real examand select the one package that gives it all to you at your discretion.
QUESTION NO: 1
A customer is documenting their Disaster Recovery process, and is considering all aspects of running the business. The following elements have been identified as essential:
Secondary data center location and equipment
Key responsibilities of critical business units
Up-to-date emergency contact information for all staff
In addition to these elements, which personnel should be listed as essential to be actively
engaged in the event of a disaster?
A. Mid-level management
Storage administrators
Application development programmer(s)
Network administrator(s)
B. System programmer(s)
Performance and capacity management team
Network administrator(s)
Operations analyst
C. Workload schedulers
System operator(s)
Storage administrator(s)
Disaster Recovery Manager
D. Database administrator(s)
System programmer(s)
Network administrator(s)
Disaster Recovery manager
Answer: D
QUESTION NO: 2
Which of the following considered as an element of High Availability for the System z platform?
A. GRS STAR
B. Capacity Backup (CBU)
C. Sysplex Failure Management (SPM)
D. Modified Indirect Data Address Word (MIDAW) facility
Answer: C
QUESTION NO: 3
A customer’s service level agreement has the following components and configuration
characteristics:
RTO=24 hours
RPO=1 hour
Flash Copy to a single set of disks at a remote site
Tape backup once per day
What would be the state of the data if a disaster occurred during a resynchronization process?
A. There would be some data loss, but the data would need to be resynchronized.
B. There would be some data loss, but RPO and RTO would support service level agreements.
C. The data would be unreliable and their RTO and RPQ would exceed service level agreements.
D. The data would be reliable with the tape backup, and support the RTO, but the RPO would exceed service level agreements.
Answer: C
QUESTION NO: 4
When considering an environment with one zEnterprise server (CEO) and one instance of z/OS, which of the following contributes to High Availability?
A. Parallel sysplex
B. Application failover
C. Processor Unit Sparing
D. Multiple copies of the data
Answer: C
QUESTION NO: 5
Which of the following are typically included as a part of the services component in any of the GDPS family of products?
A. Project planning
Local field support
Installation assistance tools
Web based training programs
B. Disaster recovery planning
Development of test methodology
Network implementation services
Remote implementation assistance
C. Availability planning
Onsite education and training
Configuration recommendations
Installation and customization assistance
D. Sizing tools
TCO cost recovery tools
Workload and batch analysis tools
Capacity and performance monitoring tools
Answer: C