C_FSUTIL_60 Question And Answer

C_FSUTIL_60 Practice Test material on the it-exams.com is available in most popular PDF format so that you can download and study offline. Candidates can learn all the questions and answers in an easy way; start from PDF and end with Test Software. Also the regular updates ensure you about the quality and accuracy of questions and the answersIt’s a good choice for you to take the C_FSUTIL_60 Question And Answer Practice Testing Engine C_FSUTIL_60 Preparation Materials online training materials. You can evaluate your weakness and strong points by the latest interactive testing engine. C_FSUTIL_60 Practice Testing Training  Exam Study Guide practice tests are written to the highest standards of technical accuracy which can make you succeed in the exam.

QUESTION NO: 1
A customer moves in to a premise and requests electricity service starting on June 7. According to the schedule records, the scheduled meter reading date is June 29, the scheduled billing date is July 1, and the allocation date for billing is June 30.
Given that batch billing is executed every night with all portions included, what is the first day the customer’s contract could be billed?
A. July 1
B. June 30
C. June 7
D. June 29
Answer: A
QUESTION NO: 2
On May 15, you try to process dunning for an account with an issue date of May 10.
Why does dunning fail to produce a result?
A. A dunning block which expired on May 13 was set on the contract account.
B. A dunning block which expired on May 13 was set on the business partner.
C. A dunning block which began on May 13 was set on the business partner.
D. A dunning block which began on May 13 was set on the contract account.
Answer: A
QUESTION NO: 3
Which object can be used in monitoring (EL31) to view meter reading results?
A. Contract
B. Device location
C. Connection object
D. Contract account
Answer: A
QUESTION NO: 4
Which criteria are used to group the underlying FICA documents for transfer to General Ledger Accounting? (Choose three)
A. Creation date
B. Currency
C. Transaction
D. Segment
E. Company code
Answer: B,D,E
QUESTION NO: 5
Which processes can be directly called within the account display transaction? (Choose three)
A. Change contract
B. Display returns history
C. Mass change
D. Create budget billing plan
E. Display installation
Answer: A,B,C